Sector: PFAS
Location: Stuart, Townsville, QLD
2,400 L/h skid hire achieving PFOS below 0.0002 ug/L for 99% species protection over six months with no breakthrough.
Client: major roads contractor on the Townsville Connection Road upgrade (water and sewer).
Duty: 2,400 L/h (40 L/min) groundwater dewatering on skid hire.
Plant: three skids of 1.65 m x 1.85 m, eight Bulk Performer units in series on the polishing skid, one 1.5 kW pump, set up and commissioned in one day, client staff trained to backwash.
Results: PFOS 0.005 to 0.194 ug/L raw reduced to below 0.0002 ug/L on every sample over five months, PFOA to below 0.0002 ug/L, meeting 99% species protection; six months of operation with no breakthrough and no filter change.