Refuelling, Workshop and Wash Bay Retrofit, Pilbara Iron Ore WA

Sector: Mining
Location: Pilbara, WA

MyCelx retrofit removed detergent-emulsified fuel that defeated a coalescing plate separator and an air-induction hydrocyclone, delivering below 10 ppm TPH at 2.5 times the CPS flow.

Client: major iron ore miner.

Problem: degreasers, truck wash detergent, floor cleaners, diesel spills from the refuelling bund and stormwater all reached one sump, emulsifying the fuel; a coalescing plate separator (CPS) could not reach compliance and a trialled air-induction hydrocyclone failed.

Duty: 5 kL/h through the existing CPS, oil 50 to 200 mg/L in very small emulsions.

Plant: skid-mounted MXR1200 housings in series with backwashable REGENerable media and MyCelx cartridge polishing, PLC-controlled backwash.

Results: clear, bright water below 10 ppm TPH and below 15 mg/L TSS, supplied for dust suppression; during storms or major washdowns the system bypasses the CPS and treats at 2.5 times the CPS flow with no extra capital.

More Mining Case Studies

Coal Mine Wash Bay Decontamination Plant, NSW

15 kL/h containerised plant reduced TPH from up to 200 mg/L to below 10 ppm and TSS to below 15 mg/L for EPA-compliant discharge and dust suppression reuse.

Gold Mine Wash Bay Water Recycling, Rural WA

40 ft containerised plant at up to 30 m3/h reduced oil from 100+ ppm to 0 to 2 ppm and TSS from 500 to below 5 ppm for Department of Health reuse.

Gold Mine Wash Water Treatment and Reuse, North-East of Kalgoorlie WA

Value-engineered 500 kL/day design removed a pond, avoided a second RO plant and delivered on time and budget in one 40 ft container.